Decommissioning Chimney 4
Demolition activities of Chimney 4 (height 80 ml) inside the Solvay Chimica Italia site in Rosignano Solvay (LI).
Removal of all the installations present on the chimney (marine ladder, walkways, parapets and gratings; installations present both on the shaft and on the top of the chimney; exhaust cone located at the base of the chimney). Removal of MCA (cords present at the junction points of the various baffles of the chimney, smoke inlet, hopper).
Demolition of all reinforced and refractory concrete structures and parts down to ground level.
Transport of all materials/waste to the Client's collection/storage centres, sorted according to the relevant EWC code.
Waste disposal.
Translated with DeepL.com (free version)